MaintenanceCalendar View

Calendar View

Navigate your maintenance schedules using Day, Week, and Month calendar views with color-coded task status indicators.

Visualize your maintenance schedule on a calendar

The calendar views give your team a time-based perspective on upcoming, current, and overdue maintenance tasks. You can switch between Day, Week, and Month views using the segmented control at the top of the Active Schedules card.

Navigate to Maintenance, then select Day, Week, or Month from the view toggle.

Three calendar modes

The Month view displays a full calendar grid for the selected month, with weekday headers (Sun through Sat) across the top.

Layout

  • Each day cell shows the date number in the top-left corner. Today's date is highlighted with a filled circle using the primary brand color.
  • Days outside the current month appear dimmed.
  • Up to 2 task previews are shown in each cell. If a day has more than 2 tasks, a "+N more" label appears below the previews.

Task previews

Each task preview inside a day cell shows:

  • A colored dot indicating status (red for overdue, amber for due today/due soon, green for on track)
  • The task description or equipment name
  • The assigned team member name (abbreviated as "First L.")

Use the left and right chevron buttons at the top of the calendar to move to the previous or next month. The current month and year (e.g., "March 2026") are displayed between the arrows.

To jump back to the current date, select the Today button in the card header.

Clicking a day

Click any day cell to open the Day Details Sheet -- a slide-out panel on the right side of the screen that lists all tasks for that day. See the Day Details Sheet section below.

Color coding for task status

All three calendar views use consistent color coding:

StatusDot / Background ColorBadge Color
OverdueRed dot / Light red backgroundRed destructive badge
Due todayAmber dot / Light amber backgroundAmber badge
Due soon (within 7 days)Amber dot / Light amber backgroundAmber badge
On trackGreen dot / Neutral backgroundGreen outline badge
No historyGreen dot / Neutral backgroundGray outline badge

Day Details Sheet

The Day Details Sheet is a slide-out panel that appears when you click a day in the Month or Week view. It provides a focused list of all tasks for the selected date.

What it shows

  • Title -- The full date (e.g., "Wednesday, March 12, 2026")
  • Subtitle -- The number of tasks scheduled (e.g., "3 maintenance tasks scheduled")
  • Task list -- Each task is displayed as a full task card with status, frequency, room, assignee, and action buttons

Available actions

From the Day Details Sheet, you can:

  • Mark Complete -- Complete a task directly from the sheet
  • Edit schedule -- Open the schedule editing dialog via the settings icon
  • Reassign -- Change the assignee for the selected date
  • View SOP -- Navigate to the linked SOP if one exists

The Day Details Sheet is especially useful in Month view, where day cells only show 2 task previews. Click any day to see the full list of tasks with all details and actions.

Selection mode and batch assignment

When you need to reassign multiple tasks at once:

Enter selection mode

Selection mode is activated from the batch assign flow. When active, checkboxes appear on each task card and on each day header (in Month and Week views).

Select tasks

Click individual task checkboxes to select specific tasks, or click the day-level checkbox to select all tasks for a given date.

Apply assignment

The Batch Assign Bar appears at the bottom of the screen showing how many tasks are selected. Choose a team member from the dropdown, select whether to Set as default assignee or Assign for these specific dates only, then select Apply.